Following on from construction and testing, Data Centre Commissioning is essential to ensure that the completed facility is configured for maximum efficiency. With a wealth of experience in data centre efficiency and innovation, Future-tech consultants help clients achieve significant cost savings by examining characteristics of the current IT load, identifying where equipment manufacturers standard specifications are not appropriate, and configuring the supporting infrastructure accordingly.

Why do I need Data Centre Commissioning?

Missing out the essential Data Centre Commissioning can lead to an inefficient facility and higher than expected operational costs. By simply identifying where equipment manufacturers’ standard specifications are not appropriate for the IT load, the supporting infrastructure, in particular the cooling plant, can be configured to meet the requirements of the facility and lead to much higher levels of efficiency. Data centre commissioning can lead to significant energy savings when implemented correctly by a specialist commissioning team. By engaging Future-tech to ensure that systems are running correctly, clients have saved up to 67% on facility operational costs.

Our Approach

Recognised as leaders in data centre energy efficiency, at Future-tech we understand that use of innovative technologies and best practice can ensure the data centre is Designed for efficiency, but to ensure it is Operated efficiently. Data centre commissioning is essential, we take the approach that as all data centres are unique, all operating practice will be individual to the organisation. The best designed facility in the world will still be inefficient if the supporting infrastructure is not configured to the actual IT load intervals. Recognised leaders in data centre innovation, Future-tech have designed cooling systems that are able to automatically re-commission themselves as IT loads fluctuate. This application is generally applied when the facility experiences large fluctuations in IT load and can lead to an annualized PUE of below 1.18 within Tier II and III environments.

Methodology

A Data Centre Commissioning team will be assigned prior to the data centre testing stage. Where Future-tech has designed the facility, this team include the original Design Team members plus Mechanical and Electrical Servicing Engineers. In our experience, this ensures continuity as the original team are familiar with the design parameters and fully understand how the facility should operate.

Where the data centre was designed by a third party, we assemble a Commissioning Team made up of a Lead Data Centre Design Consultant, an Electrical Design Engineer and a Mechanical Design Engineer. As always, we work in partnership with the client, their contractors and any other stakeholder in the project during the entire process. From equipment specification requests, through to the preparation of the commissioning plan and method statement and the eventual site visit  all relevant parties are asked for input and where appropriate invited to attend on site.

Output

Once data centre commissioning is complete, the client is provided with a  Systems Configurations Document describing the new system set points and behavioral characteristics. The document will detail new system capacities and limitations together with recommended trigger points for system revision, such as increased IT load.

The revised PUE will be provided and annualised savings shown. Future-tech are also provide training during the re-commissioning to make sure that client members of staff understand what has been changed and how  re-configured systems operate.

David Stutchfield, Energy Officer St Andrew’s

”Future-tech incorporated a plate heat exchanger in to the system that will enable us to heat some adjacent buildings with waste heat from the data centre”

Get in touch

Call

If you require any further information or have a specific enquiry call one of our in-house consultants:

T: 0845 9000 127

Related Case Studies

Dot-com data centre reaches end of life

4.5MW, former dot-com data centre requires refurbishment and power upgrade to ensure it can continue to support its clients’ changing

European Technical Due Diligence for Acquisition

Audit and appraisal of 5 sites totalling 30MW - Western and Central European locations THE BRIEF To provide technical appraisal

Southern Europe Technical Due Diligence for Investment

Assessment of design solution, construction and operational costs and projected P&L associated with a new 40MW Tier IV data centre.