Developed Design Fly-By video – 10MW in A Developing Market.

by | Feb 17, 2022 | Case Studies, Design

Project Type:                    BSRIA/RIBA Stage 2 Developed Design by Future-tech. This file is a data centre concept design produced by Future-tech and demonstrated in a fly-by video clip.

Location:                          Tier 1 Developing Market.

Size:                                  10MW.

Basis of Design:              4 x 2.5MW Data Halls.

Power:                              3 from 4 Distributed Redundant.

Cooling:                           Trim Chillers and Fan Wall (N+2 redundant).

Type:                                Retail Colocation with the ability to service wholesale clients.

Date Completed:             May 2021.

Target Market:                 International Cloud providers plus international and domestic enterprise customers.

Project Summary:           Future-tech delivered a Developed Design for a data centre with associated Technology and Innovation Hub for an International software and cloud services provider.

Innovation:

White space power density 3kW per m² capable of supporting the delivery and installation of fully populated 55U Racks (Cloud Ready). Design developed according to industry leading international design standards.