Concept Design Fly-By video – 72MW in the UK

by | Mar 12, 2021 | Case Studies, Design

Project Summary:

A leading Global operator engaged Future-tech for a fast moving land acquisition for a Data Centre in the UK. Future-tech produced a Masterplan, Concept Design and animated 3D renders.

Project Scope: 

Future-tech were given the task of finding the maximum optimisation of space on a land plot in the UK. For this a stage 2 Masterplan design with new form factor was required to be produced which included 3D renders and animated fly-by. This was produced within 14 days in order to meet timelines required for options on purchasing the land.

Location:                            UK

Size:                                   72 MW IT load across 4 buildings

Basis of Design:               4 x 3MW data halls giving 12MW buildings. 6 buildings in total.

Power:                               3 from 4 Distributed Redundant.

Cooling:                            Fan Wall with air cooled chillers (N + 3 Redundancy).

Type:                                 Metro Edge

Date Completed:             December 2020

Target Market:                 Hyperscale Clients with a power density of 2kW/m².

Sustainability:                  Market leading PUE

Innovation: 

Speed of delivery. Concept design and animated 3D renders produced in 10 working days from receipt of site information and building requirements from client.